Design coordination and pre-construction

Involve us before the design is finalised. Early involvement can make a real difference to the cost, buildability and delivery programme of a structural steelwork project.

Steel Structures works with main contractors, consulting engineers and local builders to assess practical options while the design can still be developed.

From early steelwork budgets and buildability reviews to programme planning and tender pricing, we bring the practical perspective of an experienced fabricator to the pre-construction process.

Based at our Dunmurry works, we coordinate the design process and deliver Tekla detailing in-house, supporting projects from initial discussions through to fabrication and installation.

Main contractors

Practical input before tender.

Engage while the structural frame is still being developed. We provide early cost guidance, review general arrangement drawings for buildability and identify programme considerations before the steelwork project is finalised.

Local builders

Whether you are planning a new building or an extension, we can help establish the steelwork requirements and cost at an early stage.

What we can help with

  • Early steelwork budgets for feasibility, cost planning and tender preparation
  • Detailed tender pricing and scope review
  • Buildability reviews of general arrangement drawings
  • Programme planning informed by fabrication requirements and site constraints
  • Quality and health and safety considerations for the specific project
  • Design coordination and in-house Tekla detailing

How it works

  1. 01Share your requirements: drawings, structural information or an outline of the building.
  2. 02We review the scope, buildability, execution class, programme and the information needed to progress.
  3. 03We quote on the agreed scope, with practical input on fabrication, delivery and installation.
  4. 04Once appointed, and approved-for-construction drawings with end reaction loadings are received, connection design is arranged and incorporated into the Tekla fabrication drawings.

Related services

This service sits with the rest of the frame. Follow the part you need next.

Read: Why involve a steelwork fabricator early in a project?